va loan network white logo

same day approval

Real Expertise – No Call Centers – No Runaround

Skip to the first checklist question
Checklist · repairability matrix · estimator · FAQs

VA Minimum Property Requirements (MPRs) for 2026

VA MPRs are the baseline habitability standards a home must meet to close with a VA loan. The VA appraisal checks for safety, sanitation, and structural soundness—not cosmetic perfection. If you’re new to the program rules, start with VA loan requirements.

Most common VA appraisal MPR fails

If you’re trying to predict “what will fail,” start here—then run the checklist.

  • Peeling/chipping paint (especially pre‑1978)
  • Roof leaks or obvious moisture intrusion
  • No continuous potable running water
  • Unsafe sewage/septic (non‑functioning disposal)
  • Exposed/frayed wiring or unsafe electrical
  • Missing handrails / broken steps / major trip hazards
  • Evidence of wood‑destroying insects / dry rot / fungus
  • Nonfunctional or unsafe permanent heat
Last checked: Dec 2026
Always confirm against VA Pamphlet 26‑7, Ch. 12

Interactive MPR decision checklist

Select what’s true for the home. The tool highlights items that typically trigger “repair required” or “needs more review.”

Basics Paint logic changes before/after 1978
Pre‑1978: defective paint is treated as a lead‑based paint hazard.
Exterior paint is chipping/peeling/cracking Especially important pre‑1978

Exterior defective paint exposes surfaces; pre‑1978 it’s treated as lead‑based paint.

Interior paint is chipping/peeling/cracking Pre‑1978 is a common repair trigger
Water & sanitation High‑impact items
Continuous potable running water is available
Hot water is available
Sewage disposal is safe and sanitary (sewer/septic works)
Utilities & mechanical
Electricity is available for lighting and basic equipment
Visible frayed or exposed electrical wiring
Heat is permanently installed and operational
Structure, safety & pests
Roof has active leaks or obvious moisture intrusion
Evidence of structural instability (major cracking, settlement, etc.)
Obvious safety hazards (broken steps/rails, missing guards, major trip hazards)
Evidence of wood‑destroying insects / fungus / dry rot

VA Minimum Property Requirements (MPRs) guide

What VA’s appraisal checks, what commonly triggers repairs, and how to avoid closing delays.

VA Minimum Property Requirements (MPRs) are the baseline habitability standards a home must meet to close with a VA-backed loan. The appraisal checks for safety, sanitation, and structural soundness—not cosmetic perfection. In 2026, the core standards remain consistent, but the way you prepare often determines whether you close on time or slip due to repairs and reinspections.

What the VA appraisal must confirm

  • The property must be safe, sanitary, and structurally sound, with no conditions that prevent immediate occupancy at closing.
  • Key systems must function safely, including electrical, plumbing, heating, and water and sewage, with hazards corrected before funding.
  • Access and livability matter: all-weather entry, adequate living spaces, and basic safety items like handrails must be present.
  • Obvious issues like roof leaks, peeling paint, exposed wiring, or active pests can trigger required repairs and a reinspection.

Fast ways to prevent MPR-related delays

  • Pre-screen homes before offering, focusing on roof condition, utilities, steps and railings, and signs of water damage.
  • Ensure utilities are on for the appraisal appointment, because many functional checks cannot be completed without power, water, and heat.
  • Use clear contract language for repairs so the seller’s scope, deadlines, and documentation requirements are not ambiguous.

What are the VA Minimum Property Requirements in 2026?

VA MPRs require the home to be safe, sanitary, and structurally sound at closing. If a defect blocks safe occupancy, it must be corrected before funding. The VA is not asking for upgrades, new finishes, or a perfect inspection report. It’s verifying that a borrower can move in safely without immediate hazards.

  • Structure: foundation and load-bearing elements show no major settlement, dry rot, or active wood-destroying organism damage.
  • Roof: prevents water intrusion and has reasonable expected service life.
  • Mechanical systems: operate safely (heating, electrical, plumbing) with no exposed wiring or unsafe hazards.
  • Water, sanitation, access: potable water, adequate sewage method, all-weather access.

What repairs do VA appraisers commonly require for MPR compliance?

VA-required repairs are typically safety, sanitation, or habitability items that must be corrected before closing. Cosmetic issues usually do not matter unless they reveal a deeper defect.

  • Peeling or deteriorated paint (especially pre‑1978) often triggers repair.
  • Missing handrails, unstable steps, and trip hazards are frequent calls.
  • Roof and water issues are high priority: active leaks, visible staining, bad drainage patterns.
  • Electrical/mechanical hazards are common: exposed wiring, unsafe panels, nonfunctional heating.

How MPR repairs affect closing, negotiations, and liability

If an item is truly an MPR condition, it typically must be corrected before funding. Repairs can compress timelines because reinspection scheduling, contractor availability, and documentation review all add steps. Treat safety repairs like “real work”: qualified pros + receipts + photos.

  1. Prioritize schedule-risk items first: roof, electrical, heating, plumbing hazards.
  2. Negotiate repairs with a written scope and deadline.
  3. Collect proof as work is done (photos, invoices, notes) so conditions clear fast.
  4. Do a final walkthrough to confirm repairs match scope before reinspection.

Related VA loan resources

Repairability matrix

Typical patterns: “Repair required”, “Conditional / further review”, or “Usually OK”. Not a guarantee.

VA MPR repairability matrix (typical patterns, not a guarantee)
IssueCategoryTypical outcomeWhy it mattersTypical fix / next step
Defective exterior paint (chipping/peeling/cracking)Paint / LeadRepair requiredProtects surfaces; pre‑1978 is treated as lead‑based paint.Scrape, prime, repaint using lead‑safe practices where applicable.
Defective interior paintPaint / LeadConditional / further reviewOften cosmetic post‑1978; safety issue pre‑1978.Remediate where hazardous, especially in pre‑1978 homes.
No continuous potable running waterWater & SewerRepair requiredContinuous safe water is fundamental to sanitation.Restore service; correct contamination; follow health‑authority guidance.
Unsafe or non‑functioning sewage disposalWater & SewerRepair requiredFailing sewer/septic is a direct sanitation problem.Repair systems, connect to public where required, obtain approvals.
No electricity for lighting/basic equipmentUtilities & MechanicalRepair requiredEach living unit must have electrical service.Restore power, remedy unsafe conditions.
Frayed or exposed electrical wiringUtilities & MechanicalRepair requiredClear shock/fire hazard.Licensed electrician repairs, replaces or covers conductors.
Heating system not permanently installed or non‑functionalUtilities & MechanicalRepair requiredNonfunctional or unsafe heating commonly requires repair.Repair/replace system, verify coverage and safe operation.
Roof leaks / active moisture intrusionRoof & StructureRepair requiredRoof must prevent moisture and have reasonable life.Repair/replace covering; address flashing and interior damage.
Evidence of structural instabilityRoof & StructureConditional / further reviewCore safety/soundness issue; severity drives outcome.Engineer evaluation and corrective work as needed.
Obvious safety hazards (stairs/rails/guards/trip hazards)SafetyRepair requiredMPR repairs focus on defects that impair safe use.Repair or replace unsafe elements; ensure safe egress.
Wood‑destroying insects / fungus / dry rotPestsRepair requiredCan damage structural components.Treatment + repair damaged wood; reports where required.
Purely cosmetic wear (worn carpet, scuffs, minor chips)SafetyUsually OKVA discourages conditions for cosmetic items alone.No repair unless the issue becomes a safety hazard.

Repair cost estimator (rough order‑of‑magnitude)

This is a sanity‑check, not a bid. Numbers are generic “ballpark” assumptions only.

Estimated cost: $—. Select a defect type and square footage.

Frequently Asked Questions

Short, direct answers to common VA MPR questions.

What are VA Minimum Property Requirements (MPRs)?
They’re VA’s baseline standards that focus on safety, structural soundness, and sanitation before VA will guaranty a loan.
Is the VA appraisal a home inspection?
No. The appraiser notes readily apparent MPR issues; they don’t do a full systems inspection or full home inspection scope.
Will peeling paint fail a VA appraisal?
Often yes for pre‑1978 homes (lead‑based paint assumption). Exterior defective paint can also trigger repairs to protect surfaces.
Can repairs be escrowed and done after closing?
Sometimes, depending on the item, lender overlays, and VA rules. Safety‑critical items like lead‑based paint are commonly required before closing.
What issues most often trigger “subject to repairs” for VA loans?
Common triggers include defective paint (especially pre‑1978), roof leaks, no potable water, unsafe sewage, exposed wiring, nonfunctional heating, and obvious safety hazards.
Do cosmetic issues fail VA MPRs?
Usually not. VA generally discourages conditions for purely cosmetic items unless they create a safety, sanitation, or structural concern.
Does VA require a permanently installed heating system?
In most cases, yes—adequate, safe heating is expected. If heating is missing, unsafe, or nonfunctional, repairs are commonly required.
Can a home with a roof leak pass VA appraisal?
Active leaks or obvious moisture intrusion typically trigger repairs. Even if value is supported, MPR conditions usually must be cleared.
Who decides repairs: the VA appraiser or the lender?
The appraiser identifies MPR-related conditions; the lender underwrites and may add overlays or request further documentation.
How should I use this checklist during a real purchase?
Use it to pre‑screen likely repair items and prep negotiations. Then confirm specifics with your VA‑experienced lender and the VA‑assigned appraiser.

Official references

Primary sources for VA appraisal / MPR standards.

Accuracy note Use this as a pre-screen tool, not a lending decision. Final conditions depend on the VA-assigned appraiser, lender overlays, and the specific property.
Author headshot
Created by:
Validated by: , Senior Loan Officer NMLS#1001095
Last updated

Pin It on Pinterest